Roof Top Solar
Key Points
- Application fee is $300
- Member-owner and other monthly fees are not offset by solar production
- Maximum 20 kilowatts
- Excess monthly generation is banked and rolled over monthly for 12 months (June to June)
- Excess generation bank is zeroed after 12 months, therefore solar system should be right-sized
Needed from Customer
- Interconnection Application & Agreement
- Application fee of $300
- Rider NM-RSC (2021 version) signed and dated by the member
- Proof of insurance – minimum of $100,000
- Specification sheets / one line diagrams of the installation stamped by licensed engineer
- Inspection certification from the county
Contact Information
Email solar@mpd.coop or call 843-665-4070 for more information. Lastly, you can visit the South Carolina Solar website for additional information and guidance.